Roll out at Munich airport

For a well-known airport integrator, IER provided the roll out of in total 1.988 pieces of IT equipment at 391 positions at Munich airport terminal 1. The challenge: execution took place under full operations at a major and very busy Airport.

The planning of the roll out such as coordination for the access at the positions with airlines and ground handler, with the integrator regarding provisioning of the quipment and software images. Included in the service was as well the planning and realization of the cabling and installation of the equipment. Finally, all the work done was documented and handed over to the customer.

Coordination

Installation

Documentation

approx. 2.000 pieces of equipment